Saturday, March25, 2017 L-36.com

'w strand Eye Splice'



Three Strand Eye Splice(both standard & tapered)

Step #1 " Beginning the Splice

Measure 14 crowns (or twists) from the end of the line [18 crowns for a tapered splice].
Mark this location with a temporary wrap of tape around the rope.

3S image # 1

Un-lay the rope up to the tape. Heat seal or tape the end of each individual working strands. (note: be careful that the strands do not untwist)

Step #2 Forming the eye

Bend the rope to form the desired eye size and mark with a temporary wrap of tape. This is done with the standing part of the rope in front of you, bending the tail of the rope from left to right. (note: bend following the natural bend of the rope so as not to put any twist into the eye or the splice.)

3S image # 2

Step #3 The First Set of Tucks

Lay the strands out such that you have a left, middle, and right working strand. Then place the left and middle working strands across the rope just below the taped mark.
(note: if this is your first time splicing mark the ends of the working strands with an L "left, M "middle, and R "right.)

3S image # 3

Tuck the middle strand under a strand on the standing part of the rope just beyond the taped mark. (note: if this is your first time splicing, mark the strand you tucked under as this will be your reference point.)

Take the left strand and tuck it under the strand just to the left of the one you raised on the previous step. (note: the left strand should look like it is going over the strand you raised in the previous step)

3S image # 4

Take the right strand and tuck it under the strand just to the right of the one you raised for tucking the middle strand. (Note: It is easier to do this if you first turn the rope over, as shown in photo)

3S image # 5

Pull all three working strands snug (note: the two temporary tape marks should be aligning and forming your eye.)
This completes the first set of tucks.

Step #4 Additional tucks

Perform four more sets of tucks for each of the three working strands. In each tuck the working strand should go over a strand then tucked under a strand.
(note: after each set of tucks, pull all three working strands snug)

3S image # 6

Step #5 Tapered Splice

If performing a standard splice skip this next step / go to step #6 Finishing the Splice:

If you are making a tapered splice make two additional tucks with one strand and one additional tuck with a second strand, leaving the third strand as is.

3S image # 7

Step #6 Finishing the splice

Cut and melt the ends of the working strands, leaving a stub approximately as long as the diameter of the working strand. (Note: the stub will be drawn into the rope once it is loaded up.)

3S image # 8

Ad by Google

Disclaimer:
The information on this web site has not been checked for accuracy. It is for entertainment purposes only and should be independently verified before using for any other reason. There are five sources. 1) Documents and manuals from a variety of sources. These have not been checked for accuracy and in many cases have not even been read by anyone associated with L-36.com. I have no idea of they are useful or accurate, I leave that to the reader. 2) Articles others have written and submitted. If you have questions on these, please contact the author. 3) Articles that represent my personal opinions. These are intended to promote thought and for entertainment. These are not intended to be fact, they are my opinions. 4) Small programs that generate result presented on a web page. Like any computer program, these may and in some cases do have errors. Almost all of these also make simplifying assumptions so they are not totally accurate even if there are no errors. Please verify all results. 5) Weather information is from numerious of sources and is presented automatically. It is not checked for accuracy either by anyone at L-36.com or by the source which is typically the US Government. See the NOAA web site for their disclaimer. Finally, tide and current data on this site is from 2007 and 2008 data bases, which may contain even older data. Changes in harbors due to building or dredging change tides and currents and for that reason many of the locations presented are no longer supported by newer data bases. For example, there is very little tidal current data in newer data bases so current data is likely wrong to some extent. This data is NOT FOR NAVIGATION. See the XTide disclaimer for details. In addition, tide and current are influenced by storms, river flow, and other factors beyond the ability of any predictive program.