Thursday, June29, 2017 L-36.com

'3 Strand Long Splice'




NOTE: DO NOT HIT REFRESH!!! These files are big and can take a long time to load. This file is 0.4 MB. Give it time.
If there is text in the file, you can scroll it while the image loads. Enjoy

View PDF

Image Preview



Ad by Google

PDF to Text

Long splice 3strand Class I
Class I ropes are made from any or all of the following Additional rope needed for splice
fibers olefin polyester or nylon length of 36 crowns x 2
Unlay the end of each rope a minimum of 36 crowns Lash securely with twine as
marry the ropes shown to prevent ropes from coming apart further Place ropes together alternating
step
the strands from each Note how strands are numbered to show their relative positions
throughout the long splice procedure
3 4
Take lashing off one side Unlay one strand 2 a minimum of 25 crowns
u n l ay r e p l a c i n g s t r a n d s and replace it with a strand from the other side 5 as it is being unlaid
step Lash securely as shown to hold strands in place Be sure to place lashing
at the marriage point to hold strands securely
3 4
1 6
Step 3 is like step 2 except in the opposite direction One strand 6 is replaced with another
3 Each point is securely lashed This leaves strands 1 and 4 at the marriage point
step
Remove lashings and tie each pair of opposing strands 25 6314 with an
tie off opposing strands
overhand knot Be sure knot is tied in the direction of strand twist
Tuck each strand 4 times These tucks should be at right angles to the final tucks of the twist
in the rope
The splice may be tapered by adding an additional 23and at each
ta p e r a n d f i n i s h s p l i c e strand junction Now roll and pound well Finally cut the strands off close to the rope
step
Page 1 of 1
2090 Thornton Street T 3603844669 Ferndale WA USA 98248
F

Ad by Google

Disclaimer:
The information on this web site has not been checked for accuracy. It is for entertainment purposes only and should be independently verified before using for any other reason. There are five sources. 1) Documents and manuals from a variety of sources. These have not been checked for accuracy and in many cases have not even been read by anyone associated with L-36.com. I have no idea of they are useful or accurate, I leave that to the reader. 2) Articles others have written and submitted. If you have questions on these, please contact the author. 3) Articles that represent my personal opinions. These are intended to promote thought and for entertainment. These are not intended to be fact, they are my opinions. 4) Small programs that generate result presented on a web page. Like any computer program, these may and in some cases do have errors. Almost all of these also make simplifying assumptions so they are not totally accurate even if there are no errors. Please verify all results. 5) Weather information is from numerious of sources and is presented automatically. It is not checked for accuracy either by anyone at L-36.com or by the source which is typically the US Government. See the NOAA web site for their disclaimer. Finally, tide and current data on this site is from 2007 and 2008 data bases, which may contain even older data. Changes in harbors due to building or dredging change tides and currents and for that reason many of the locations presented are no longer supported by newer data bases. For example, there is very little tidal current data in newer data bases so current data is likely wrong to some extent. This data is NOT FOR NAVIGATION. See the XTide disclaimer for details. In addition, tide and current are influenced by storms, river flow, and other factors beyond the ability of any predictive program.